• Engineering design support
• Control system design
• Control system programming
• Control system commissioning and start-up
Country: USA
Date: 01/10/2009
• Existing control system upgrade
• Instrumentation calibration, installation and loop check
Country: Colombia
Date: 01/09/2009
• Instrumentation calibration, installation and loop check for 200 instruments aprox
Country: Colombia
Date: 01/08/2009
• Control System Design, Control Panel Supply and Integration
• AB Controllogix, AB PanelView 1000+, ICONICS
• Control Room Console design and Supply
• Field Support (comissioining and start-up) - Field Instrumentation Calibration & Installation
Country: Colombia
Date: 30/07/2009
• Control Systems support on multiple platforms ( AB, DeltaV, HoneyWell, Fisher ROC, Telemecanique)
For Rio Ceibas Field
Country: Colombia
Date: 15/06/2009
• Control Systems support on multiple platforms ( AB, DeltaV, HoneyWell, Fisher ROC, Telemecanique)
For Yaguara Field
Country: Colombia
Date: 15/06/2009
• Pressure switches installation
• Civil, Piping and Wiring work
Country: Colombia
Date: 03/06/2009
• Control System Design, Control Panel Supply and Integration
• AB Controllogix, AB PanelView 1000+
Country: Colombia
Date: 21/03/2009
• Field Support (comissioining and start-up) - Field Instrumentation Calibration & Installation
• Field Support (comissioining and start-up) - AB ControlLogix Control System
Country: Colombia
Date: 29/01/2008
• Field Support (comissioining and start-up) - Field Instrumentation Calibration & Installation
• Field Support (comissioining and start-up) - AB ControlLogix Control System - ICONICS
Country: Colombia
Date: 04/12/2008
• Field Support (comissioining and start-up) - AB ControlLogix, PLC5, SLC500, Wonderware Intouch
• Yokogawa CS3000
Projects:
• Control Systems Reliability project 9 offshore facilities
• AREA B Production Allocation Project
• AREA B Production Allocation Project
• AREA B Automated Well Testing project
• Alarm Object Analysis Project
• LOMBA Platform Control System Upgrade
• Alarm Object Analysis Project
Country: Angola
Date: 12/1/2008 - PRESENT
• Engineering Design Support
• Field Support (comissioining and start-up) - AB ControlLogix Control System - ICONICS
Country: USA
Date: 01-DEC-08 - PRESENT
• Field Support (comissioining and start-up) - Field Instrumentation Calibration & Installation
• Field Support (comissioining and start-up) - AB ControlLogix Control System
Country: Colombia
Date: 04-Dec-08 - 13-Feb-09
• Control System Design, Control Panel Supply and Integration
• AB Controllogix, AB PanelView 1000+, ICONICS
• Control Room Console design and Supply
• Field Support (comissioining and start-up) - Field Instrumentation Calibration & Installation
Country: Colombia
Date: 04/11/2008
• Control System Design, Control Panel Supply and Integration
Country: Colombia
Date: 26/11/2008
• Control System Design, Control Panel Supply and Integration
• AB Controllogix, AB PanelView 1000+
Country: Colombia
Date: 21/11/2008
• Control System Design, Control Panel Supply and Integration
Country: Colombia
Date: 20/11/2008
• Control System Design, Control Panel Supply and Integration
Country: Colombia
Date: 12/11/2008
• Control System Design, Control Panel Supply and Integration
Country: Colombia
Date: 31/10/2008
• 8 Nema 4 switch boxes
Country: Colombia
Date: 30/10/2008
• NEMA 4X Control Panel design, supply and integration
Country: Colombia
Date: 29/09/2008
• Control System Design, Control Panel Supply (3) and Integration
• Field Support (comissioining and start-up) - Field Instrumentation Calibration & Installation
• Field Support (comissioining and start-up) - AB ControlLogix Control System
Country: Colombia
Date: 16/10/2008
• Control System Design, Control Panel Supply (3) and Integration
• Control Room Console design and Supply
Country: Colombia
Date: 15/10/2008
• NEMA 4X Control Panels
Country: Colombia
Date: 29/09/2008
• Field Support (Equipment troubleshooting) - AB ControlLogix Control System
Country: Colombia
Date: 02/09/2008
• NEMA 4X Control Panels
Country: Colombia
Date: 22/06/2008
• 3 Control Panels for Wellhead Process variable Videologging
Country: Colombia
Date: 05/08/2008
• Engineering Design Support
• Control System Design, Control Panel Supply and Integration
• Field Support (comissioining and start-up) - AB ControlLogix, PLC5, SLC500, Wonderware Intouch
Projects:
• Control Systems Reliability project 9 offshore facilities
• AREA B Production Allocation Project
• RSF Tank Battery Automation
• Barnes Tank Battery Automation
• Honor Ranch Tank Battery
• Culbert Tank Battery Automation
• Snyder Tank Battery Automation
• Hyde-Pinkerton Tank Battery Automation
• Texaco Union LACT & VRU Automation
• Bardsdale VRU & Gas Compressor Automation
• Shiells Shallow VRU Control
• SPS VRU & Gas Compresor Automation
• Ojai LACT, VRU & Gas Compresor Automation
• Timber Canyon VRU & Gas Compresor Automation
• Silverthread VRU & Gas Compresor Automation
• Santa Paula Fee Tank Battery LACT & VRU Automation
• Oakridge VRU Control, Revisions plus Calibration of Oxygen Transmitters & Instrumentation Support
• Shiells Canyon CO2 Plant - Migration from Cygnet to Iconics
• South Mountain WW Facility - Pumps control
• RSF Gas Plant Automation
• Coastal Leak Detention System
• Vintage East L.A. Tank Battery Automation
• Vintage Bandini Tank Battery Automation
• Vintage Sansinena automation: Site 3 Automation
• Vintage Sansinena automation: Site 8 Automation
• Vintage Sansinena automation: Stewart site Automation
• Texaco Norcop PIT Pump Automation
• San Miguelito Field - Water Plant Automation
• South Mountain Pums Control - Operations
• Micrologix Panels for Inland Repeaters
• Oakridge DPT Installation with VRU control
Country: USA
Date: 4/1/2008 - PRESENT
• 8 Control Panels and 130 switch boxes
Customer: OXY ANDINA
Date: 18/06/2008
• Engineering Design Support
• Field Support (comissioining and start-up) - AB ControlLogix Control System - ICONICS
Country: USA
Date: 17/03/2008
• Field Support (comissioining and start-up) - Field Instrumentation Calibration & Installation
• Field Support (comissioining and start-up) - AB ControlLogix Control System
Country: Colombia
Date: 19-FEB-08 - 21-Apr-08 - 16-May-08
• Engineering Design Support
• Field Support (comissioining and start-up) - AB ControlLogix Control System - ICONICS
Country: USA
Date: 07/02/2008
• Field Support (comissioining and start-up) - Field Instrumentation Calibration & Installation
• Field Support (comissioining and start-up) - AB ControlLogix Control System
Country: Colombia
Date: 07/02/2008
• Field Support (comissioining and start-up) - Field Installation
• Field Support (comissioining and start-up) - Field Instrumentation Calibration & Installation
Country: Colombia
Date: 19/12/2007
• Control System Design, Control Panel Supply and Integration
• AB Controllogix, AB PanelView 1000+
Country: Colombia
Date: 03/12/2007
• Control System Design, Control Panel Supply and Integration
• AB Controllogix, AB PanelView 1000+
Country: Colombia
Date: 09/11/2007
• Field Support (comissioining and start-up) - AB ControlLogix, PLC5, SLC500, Wonderware Intouch
• Yokogawa CS3000
Projects:
• Control Systems Reliability project 9 offshore facilities
• AREA B Production Allocation Project
• AREA B Automated Well Testing project
• Alarm Object Analysis Project
• LOMBA Platform Control System Upgrade
• AREA B Wonderware Upgrade Project
Country: Angola
Date: 11/1/2007 - 12/1/2008
• Engineering Design Support
• Field Support (comissioining and start-up) - Field Instrumentation Calibration & Installation
• Field Support (comissioining and start-up) - AB ControlLogix Control System
Country: Colombia
Date: 15/10/2007
• Fabrication, Wiring, assembly of 8 Control System Panels
Country: Colombia
Date: 10/10/2007
• Engineering, programming, FAT, Control panel design, fabrication and assembly, commissioning and Star-up.
Country: Colombia
Date: 10/09/2007
• Well head Control System design and programming
• Allen Bradley Controllogix and AB PanelView 1000.
Country: USA
Date: 09/05/2007
• Well head Control System design and programming
• Allen Bradley Controllogix and AB PanelView 1000.
Country: Kazakhstan
Date: 07/03/2007